EPD & LCA Services
- How are transportation distances (A2) calculated when materials are loaded at one location but concrete is mixed at the project site?
- How do I update the supplier of an existing material?
- How do I add new materials to the EPD Generator, and what does it cost?
- How do I reset my password?
- What standards do EPDs need to follow?
- What are EPDs and LCAs?
- Is carbon reporting mandatory for concrete producers?
- How can we generate EPDs at scale?
- How do I clarify or change the name/code of an existing material?
- How do I update the manufacturer representative listed on our EPDs?
- When do I need to update my plant operational data, and how do I know the date?
- Where does the concrete production stage (A3) actually "end" for a volumetric mixer — and why isn't it the loading yard?
- How are distances handled when a fleet loads materials from more than one location?
- Why does my concrete EPD require a cement EPD based on ISO 21930 rather than EN 15804?